EN
江苏五越实验室设备有限公司

Laboratory decoration process

Author:WuyTime:2024-10-21 16:03:55

9.jpg

1、 Laboratory Site Selection

Based on a thorough analysis and demonstration of the laboratory project to be implemented, the laboratory site will be selected in combination with location and environmental factors. Jiangsu Wuyue Laboratory Equipment Co., Ltd. kindly reminds that the laboratory site needs to consider fire safety acceptance and obtain environmental impact assessment qualifications, especially for laboratories that require CMA metrology certification and CNAS accreditation in the later stage. Environmental impact assessment qualifications are a prerequisite.

2、 Selection of laboratory construction units

The laboratory design and construction unit should choose a domestic company that provides comprehensive laboratory solution services. At the same time, the company's strength and level must be strictly evaluated, and it is best to conduct on-site inspections of its completed successful cases and the location of the company.

3、 Preliminary establishment of overall laboratory planning scheme

The overall planning of the laboratory includes the construction of appearance, style, height, layout, etc. Before constructing the laboratory, it is necessary to understand the current needs and consider future development. Reference can be made to relevant industry laboratory construction cases before conducting the overall planning of the laboratory.

4、 Laboratory layout plan

The laboratory layout design stage should consider the needs of work and development in as much detail as possible, allocate space reasonably, and optimize integration as much as possible. A complete laboratory layout is necessary to ensure the subsequent professional design of water, electricity, wind, and other related fields. In addition, Jiangsu Wuyue suggests that the requirements for CMA certification and CNAS accreditation review be advanced to the planning and design stage, completely avoiding the risk of laboratory review failure, rectification, and reconstruction due to unreasonable early planning.

5、 Laboratory air conditioning system

The air conditioning system should not only control the temperature and humidity of the laboratory, but also be coordinated with the laboratory ventilation system to truly and effectively ensure the effectiveness of laboratory construction. According to different layout methods, it can be divided into decentralized air conditioning systems, centralized air conditioning systems, and locally centralized air conditioning systems. The selection should be based on the actual situation during design.

6、 Laboratory ventilation system

The laboratory ventilation system is one of the largest and most widely influential systems in the entire laboratory design and construction process. The design of the laboratory ventilation system affects the environment of the entire laboratory, the health of laboratory personnel, and the operation and maintenance of experimental equipment.

7、 Laboratory power distribution system

The power distribution system in the laboratory is designed by professional designers based on the specific requirements of experimental instruments and equipment, taking into account various factors. Due to the complex requirements of laboratory instruments and equipment for circuits, the design of the power distribution system not only needs to consider the existing instrument and equipment situation, but also the development direction of the laboratory in recent years, fully considering issues such as reserved power distribution systems and circuit maintenance.

8、 Laboratory gas supply system

The operation of many laboratory equipment requires various gas supplies, and the safety of the gas cylinder room must be guaranteed.

9、 Laboratory water supply and drainage system

The laboratory water supply and drainage system is an integrated product with the building water supply and drainage system. Therefore, the design work must be determined by professionals based on the water supply and drainage requirements of the experimental platform configured in the laboratory, and then the overall water supply and drainage layout of the project must be designed.

10、 Laboratory fire protection system

The requirements for fire safety in laboratories are slightly higher than those in ordinary places, and laboratory design should adopt different fire protection measures according to specific situations to ensure the fire safety of the laboratory.

11、 Selection of laboratory furniture

Choose appropriate laboratory furniture according to the layout of the laboratory. The selection of laboratory furniture should first consider meeting the needs of the work, and then consider factors such as material, structure, and color matching of the furniture.

12、 Laboratory room decoration

During laboratory decoration, Jiangsu Wuyue generally does not use large integral structures for ceilings, which can pose hidden dangers for subsequent construction and maintenance. Both sides of the visiting corridor or large instrument rooms can be designed with floor to ceiling glass curtain walls, which are more transparent and bright, making it easier to manage and visit.

Pre:The future of laboratory furniture: trends towards intelligence, environmental friendliness, and diversification

Next:没有了!